Vitafoods Europe 2027: let’s meet up in Barcelona
Starting a project
FAQ

Management and collaboration

Before launching a manufacturing project, it is important to know how much time to allow, what volumes to commit to and how these will change over time. These answers will help you plan your launch with our teams, from project approval through to the delivery of batches.

Can the catalogue formulas be marketed under my own brand?

Yes. They are catalogue references, developed by PiLeJe CDMO, that you market under your brand. Regulatory compliance and the substantiation of health claims on the target market remain the responsibility of the brand owner, to whom we provide the necessary technical documentation.

Can PiLeJe CDMO support my brand’s growth?

Yes. Our industrial facility is sized to support your rise in volume, from small and medium production runs through to large-scale production, and draws on an already-structured expansion plan to absorb additional volumes.

How does PiLeJe CDMO secure the food supplement supply chain?

End-to-end traceability is ensured by our Sage ERP, from the receipt of raw materials to the dispatch of finished products, including batch release. This command of the flow, from sourcing to delivery, secures your entire supply chain.

Can your production capacity keep pace with my growth?

Yes. The site runs on a three-shift pattern (3×8) and draws on an already-structured industrial expansion plan to absorb additional volumes quickly.

What production run sizes can you handle?

PiLeJe CDMO packages large industrial runs as well as small and medium production runs. That flexibility makes it possible to adjust volumes at every stage of your launch, from market testing through to ramping up.

What are the manufacturing lead times for a contract-manufactured plant-based food supplement?

For a bespoke plant-based supplement, allow around 6 to 12 months between order and delivery, once the industrial formulation has been validated. For a faster launch, our white-label catalogue, which brings together 12 health segments validated under ICH conditions, allows a time to market of 3 to 4 months.

What is the time to market with your ready-to-launch solutions?

The white-label solutions offered by PiLeJe CDMO allow an estimated time to market of 3 to 4 months, because the formulations are already stabilised and validated at industrial scale.

What is the manufacturing lead time for a bespoke probiotic formulation?

Once the dosage form has been validated and the pilot trials completed, the average lead time for large-scale manufacturing of a probiotic supplement is around 3 to 4 months, between the firm order and delivery of the batches. This cycle secures compliance with our quality control protocols before the products are released.

What is the average time to market for a white-label catalogue product?

The average time to bring a catalogue product to market is 3 to 4 months. This speed comes from using formulations whose industrial feasibility, regulatory compliance and raw material sourcing have already been validated at our Saint-Bonnet-de-Rochefort site.

What is the real timeframe for launching a white-label product?

The average timeframe is 3 to 4 months. Access to formulations that have already been developed and tested removes the development phase: what remains is project validation, customisation and production.

image

Let’s develop your future nutraceutical range together

Looking to enrich your existing offer or launch a new brand with high-performance, high-quality products that are immediately available? Our experts will support you in making your selection.